Page 1
Directions for use of the Samson liquid ring pumps KL350 - KL400 - KL430 – KL500 KL350 - KL400 - KL430 – KL500 Before installing the pump. Please read carefully the installation and operation manual. Installation of the pump and any ancillary equipment. Should be carried out in accordance with the prevailing health and safety legislation.
Page 4
HANDLING FOUNDATION 90°±10° 115kg BEFORE START BEFORE START Discharge Suction Clockwise Type Discharge min 1/2” Suction Counter- clockwise Type VAPOURS BELT DRIVE Min. 150mm OPERATION GREASING √ 8000/h Bearing grease, Stamina HDS2 TEMPERATURE DRAINING max. 120°C ATEX max. 80°C Max. 50°C max.
Page 5
Dismantling Remove the bolts pos 13 and 14. Remove the bearing cap pos 6 and 7. Remove the tolerance rings between the bearing and the bearing cap. By assembling pos 13 20Nm Use 2 Pcs M10 bolts and pull out the bearings Pos 3, 4, 8, 9, 10 and 19 can now be removed.
Page 6
Spare part list – KL series KL350 - 100 mbar Impeller Housing Shell Flowplates KL350R0SSS00ASD St. steel Cast iron Cast iron Cast iron KL350R0SSE00ASD St. steel Cast iron Cast iron St. steel KL400 - 33 mbar Impeller Housing Shell Flowplates...
Page 7
Pos. Pcs. Part no.: Dansk English Deutsch Français 1623002 Svøb KL350, KL400 Casing KL350, KL400 Mittelkörper KL350, KL400 Boitier KL350, KL400 1623013 Svøb KL430, KL500 Casing KL430, KL500 Mittelkörper KL430, KL500 Boitier KL430, KL500 1623001 Pumpehus Pump house Pumpengehäuse Corps de pompe 1623030 Flowplade i støbejern Flow plate of cast iron...
Need help?
Do you have a question about the KL Series and is the answer not in the manual?
Questions and answers