Cisco ONS 15454 M6 Installation Manual page 28

Hide thumbs Also See for ONS 15454 M6:
Table of Contents

Advertisement

DLP-G675 Verify the ONS 15454 M6 Shelf for DC Power Module Installation
Figure 27: AC Power Module Installation Rear Side of the ONS 15454 M6 Shelf
Step 2
Loosen the screw and move it to the left position (towards the AC silk-screen text).
Step 3
Tighten the screw again to a torque value of 4 in-lb (0.45 N-m).
DLP-G675 Verify the ONS 15454 M6 Shelf for DC Power Module Installation
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
Verify the position of the mechanical locking system on the rear side of the chassis. To use the DC power
module the screw must be close to the DC silk-screen text (see the following figure).
Installing the ONS 15454 M6 Shelf
28
This task verifies the shelf for DC power module installation.
None
NTP-G305 Unpack and Inspect the ONS 15454, ONS 15454 M2, and ONS 15454
M6 Shelves
Required
Onsite
None
Installing the ONS 15454 M6 Shelf

Advertisement

Table of Contents
loading

Table of Contents