Cisco ONS 15454 M6 Installation Manual page 145

Hide thumbs Also See for ONS 15454 M6:
Table of Contents

Advertisement

Installing the ONS 15454 M6 Shelf
Figure 106: Mixed Multishelf Configuration without a Catalyst Switch Using ONS 15454 M6 as the Node Controller
Step 4
Return to your originating procedure (NTP).
DLP-G683 Connect the ONS 15454 as the Node Controller in a Mixed Multishelf
Configuration
Purpose
Tools/Equipment
Prerequisite Procedures
DLP-G683 Connect the ONS 15454 as the Node Controller in a Mixed Multishelf Configuration
Use this procedure to connect the ONS 15454 as the node controller and a mix
of ONS 15454 and ONS 15454 M6 as subtending shelves using the Catalyst 3560.
• Two Cisco Catalyst 3560 switches must be installed in same rack as the node
controller shelf; refer to the Cisco Catalyst 3560 product documentation for
installation instructions.
• Cross-over (CAT-5) LAN cables
NTP-G15 Install the Common Control
NTP-G313 Install and Configure the TNC, TNCE, TSC, or TSCE Card
Cards.
Installing the ONS 15454 M6 Shelf
145

Advertisement

Table of Contents
loading

Table of Contents