Cisco ONS 15454 M6 Installation Manual page 125

Hide thumbs Also See for ONS 15454 M6:
Table of Contents

Advertisement

Installing the ONS 15454 M6 Shelf
Figure 94: ECU module Cable Routing
Figure 95: Cable Management
Step 2
Fix the cables using the tie-wrap provided in the accessories kit.
Step 3
To route the optical patch cords or copper cables, do the following as necessary:
a) Route the optical patch cords from the line cards through the fiber or cable module as shown in the
following figure.
DLP-G655 Route and Lock Cables
Installing the ONS 15454 M6 Shelf
125

Advertisement

Table of Contents
loading

Table of Contents