Download Print this page

ABB GE Power Break II Installation Instructions Manual page 5

Replacement stop block kit

Advertisement

5
Figure 15: Allen Screw to be loosened for Stop Block Removal
Spring Frame
Bearing
Figure 16: Screwdriver Placement for Deflection of Assembly Wall
Figure 17: Removal of Stop Block Assembly
Tubing
with
Collar
Figure 18: Stop block in position in breaker.
21.
22.
23.
24.
25.
26.
Replace the Electric Operator if previously rem oved
by securing with the long screws on the left side of
the spring assembly wall and the short hex screws on
the bottom of the spring assembly (Figure 23).
Operate the charging handle one more time to fully
charge the spring, then close and trip the breaker.
Operate the charging handle once and hold the
handle extended while reinstalling the breaker top
cover, as shown in Figure 2. Tighten the four #10-32
screws to 15 in-lb.
Replace the trim plate, if present, and tighten the four
#8-32 mounting screws to 20 in-lb.
Operate the charging handle until the spring is
completely charged. Close and trip the breaker.
Return the breaker to operation.

Advertisement

loading
Need help?

Need help?

Do you have a question about the GE Power Break II and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel