Download Print this page

Left Side View; Front View - ABB GE Power Break II Installation Instructions Manual

Replacement stop block kit

Advertisement

6
Figure 19: Rotating the close de-latch mechanism to release the charging pawl.
Figure 22: Electric Operator Slid Left on Draw-out Breaker after long Phillips screws unscrewed
Figure 21: Draw-out Breaker with Electric Operator

Left Side View

Figure 20: Reinstalling the closing spring.

Front View

7
/
Bolt
16
Electric Operator
slid left

Advertisement

loading
Need help?

Need help?

Do you have a question about the GE Power Break II and is the answer not in the manual?