Calibration; Troubleshooting - Key Diagnostics DOSIPUMP DP 1000 Series User Manual

Peristaltic pumps
Table of Contents

Advertisement

5.4 Calibration

Corporate guidelines prescribe that all companies operating with a quality assurance system must regu-
larly calibrate their instruments and equipment. Calibration must ensure that the unit complies with the
stipulated specifications.
When should calibration be carried out?
Calibration relates to the dosing volume of the pump as a function of the tube.
Calibrate;
• If a new tube type is used and added to the tube calibration store for later use.
• If using culture media with greatly differing viscosities are used.
• At regular intervals, e.g. every 3 months.
• If the silicone tubing flexibility changes and results in a general volume drift. This is based on many
autoclaving cycles, standard tube flexibility loss, age, UV exposure e.g.)
NOTE

5.5 Troubleshooting

5.5.1 Overview
The D
P
1000 software incorporates troubleshooting routines which can be used to correct certain
OSI
UMP
problems without action on the part of after-sales servicing technicians.
If a problem occurs on the D
erator with prompts on the graphical user interface. If these on-screen prompts are followed, the fault or
error can then normally be remedied without action on the part of after-sales servicing technicians.
Each error message with alarm function also contains a description of the fault or error.
5.5.2 Fault clearance
The table below can be used to help you to remedy certain problems which may occur during operation
of the D
P
1000. This table contains information on the symptom, its possible causes and the re-
OSI
UMP
medial action for the relevant fault or error involved.
Errors which occur before operation
Symptom
Device does not start
Replacing the device fuse
Page 17 / 24
The calibration procedure is described in Chapter "Calibration menu".
P
1000, the unit attempts to correct the problem by providing the op-
OSI
UMP
Possible cause
Plug not plugged in
Master switch not switched on
Master switch fuse defective
No mains power
DosiPump 1000 User Manual
Corrective action
Check power connection
Switch on
Check fuse.
See details of description.
Check power connection
Version 1.01E

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dosipump dp1000Dosipump dp1000 fast730’000740’000

Table of Contents