Navien NFC-175 Installation & Operation Manual page 32

Nfc condensing combi-boilers
Hide thumbs Also See for NFC-175:
Table of Contents

Advertisement

3.6.3 System Application - Zone System with Pumps (Primary/Secondary Piping)
Not to exceed 4 pipe Dia or Max. 12"
Pressure
Relief Valve
System application drawings are intended to explain the system piping concept only.
Note
Install a NaviClean filter in the system return to remove foreign objects from the system. Foreign objects inside the system may
result in abnormal system operation.
Refer to "3.4 Filling the System" on page 28 for make-up water connections and refer to the requirements of your local codes
to ensure compliance.
Use a pump with an integral check valve or install a check valve at the pump outlet.
Refer to "3.7.3 Wiring Diagram - Zone Pump System" on page 39 for wiring connections.
32
Installing the System Piping
NaviClean
Air Vent
Additional Zone
Zone #2
Air Separator
Expansion Tank
Zone #1
Backflow
preventer
Pressure
reducing valve
Make-up Water

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nfc-200

Table of Contents