Assembly & Set-Up
Contents of Carton
•
Two Ignition Keys
•
One 110V Extension Cord
Assembly
Handle
1.
Place the shift lever in the Forward-6 position
2.
Remove the lower plastic wing nut and carriage bolt from
each side of the upper handle; then raise the upper handle
assembly until it snaps over the lower handle. See Figure
3-1.
Figure 3-1
3.
Looking beneath the handle panel, check that all of the
cables (steering, auger, shift, and drive) are properly routed
and not pinched or kinked.
NOTE: Make certain the upper ends of each cable are
seated properly in the proper brackets.
4.
Secure the handle by tightening the plastic knob located
on both the left and right sides of the handle. Remove
and discard any rubber bands, if present. They are for
packaging purposes only.
•
One Snow Thrower
•
One Snow Thrower Operator's
Manual
Chute Assembly
1.
Remove wing nut and hex screw from chute control
assembly and clevis pin and cotter pin from chute support
bracket. Position the chute assembly (forward-facing) over
the chute base. See Fig. 3-2.
•
One Chute Assembly
1
Figure 3-2
3
2
1
7