Toro E-Z Vac 78570 Operator's Manual page 10

Twin bagger for 2016 and after grandstand mower
Table of Contents

Advertisement

Figure 11
1. Transmission bolt
2. Nut
10.
Use the bolts and nuts you removed in step
secure the right mount bracket and fan shroud
to the frame
(Figure
to 45 N∙m (27 to 33 ft-lb).
11.
Loosely install the front mount bracket to the
front of the control tower using 2 carriage bolts
(1/4 x 5/8 inch) and 2 nuts (1/4 inch) as shown
in
Figure
12.
3. Tower-panel bolt
4. Right mount bracket
11). Torque the bolts to 37
1. Front of the control tower
2. Carriage bolt (1/4 x 5/8
inch)
g037607
12.
Lower the operator's platform.
13.
Install the right tire, torque the lug nuts to 115 to
142 N∙m (85 to 105 ft-lb), and lower the machine
(Figure
8).
9
to
10
Figure 12
3. Front mount bracket
4. Nut (1/4 inch)
g037608

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents