3. With the help of another person, place two pack-
ing inserts from the packing material under the
Frame (1) so that the Frame is lifted off the floor.
Have another person hold the elliptical to
prevent it from moving from side to side until
this step is completed.
Attach the Front Stabilizer (2) to the Frame
(1) with four 5/16" x 2 1/2" Screws (88). Then,
remove the packing inserts and lower the Front
Stabilizer.
4. Tip: Be careful not to pinch the Wire
Harnesses (97, 54) during this step. Start all
screws before tightening any of them.
While a second person holds the Upright (6)
near the Frame (1), connect the Upper Wire
Harness (97) to the Lower Wire Harness (54).
Attach the Upright (6) to the Frame (1) with
five 5/16" x 1" Screws (81) and five 5/16" Split
Washers (105).
3
4
6
81
105
81
8
1
2
88
88
Avoid pinching the Wire
Harnesses (97, 54)
97
54
1
105
81
Need help?
Do you have a question about the 940 CE and is the answer not in the manual?
Questions and answers