Example for a measurement cycle configuration
In this chapter an individual measurement cycle should be created with the features described
at the chapters below.
The measurement cycle should have the following sequence:
Following points must be done to configure the individual measurement cycle:
1. Open the measurement cycle config. menu: Path:
2. The default measurement cycle will appear. Open the cycle phase detail of the first
zeroing and adjust the phase duration at 25 min.
3. Leave the cycle phase detail and select the second point. Switch with the
arrow keys
until the measurement SP2 is selected.
4. Open with the
OK
duration-phase at 15 min. and the suction/response time until the pure meas. time has
the value of 3 min. Use for this operation the
Or
F1/F3
key the cycle phase detail of the measurement SP2. Adjust the
SWG 100 User Manual
E
/
XTRA
MEASUREMENT CYCLE CONFIG
Or
F1/F3
arrow
keys.
Or
F1/F3
.
left/right
Page 85 of 155

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SWG100 CEM and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents