Operation Manual / 4 Product description / A150-M56/66/57/67 -
A155-M..
6 Periodic maintenance work / 6.1 Foreword to maintenance
6
Periodic maintenance work
6.1
Foreword to maintenance
Maintenance work includes regular visual controls and cleaning operations which are inten-
ded to ensure the trouble-free functioning of the turbocharger.
To allow you to observe the standard service intervals and to maintain a high turbocharger
efficiency, ABB Turbocharging recommends that the cleaning procedure be carried out dur-
ing operation. This allows the thermal load of the engine to be kept low while ensuring max-
imum fuel efficiency.
Maintenance inter-
Maintenance work
val
1)
24 ... 72 h
1)
50 ... 200 h
According to rating
2)
plate
12000 h
Table 10: Maintenance table
[h] = Hours of operation
1)
If the maintenance intervals are incompatible with operation of the engine, contact ABB
Turbocharging.
2)
ABB Turbocharging recommends having mechanical cleaning carried out by an ABB Tur-
bocharging Service Station during the service work. Otherwise, only carry out mechanical
cleaning if cleaning during operation is not sufficient to achieve the thermal load and the
rating of the engine.
© Copyright 2020 ABB. All rights reserved.
Cleaning the compressor during operation
→40
Cleaning the turbine during operation →43
Cleaning components mechanically →47
Uncoupled filter silencer A155-M
Changing the absorption element →57
HZTL4032_EN
Operating status
Engine load 50 ... 85%
Engine load 20 ... 40%
(guideline value)
Engine stopped
Engine stopped
Rev.P
March 2020