Static Power iSTS F1 User Manual

Wall mount static transfer switch

Advertisement

Quick Links

iSTS
Model F1
User Manual
Wall Mount Static Transfer Switch
iSTS F1 – User Manual R03

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the iSTS F1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Static Power iSTS F1

  • Page 1 Model F1 User Manual Wall Mount Static Transfer Switch iSTS F1 – User Manual R03...
  • Page 2 STATIC POWER Pty Ltd Post to: Manufactured at: Contact us: ABN 42 101 765 913 Box 2003 5 Candlebark Court +61 3 9437 0494 Research Delivery centre Research, VIC 3095 support@staticpower.com.au Research, VIC 3095 - Australia Australia www.staticpower.com.au iSTS – User Manual...
  • Page 3: Table Of Contents

    6.1 Home Page 6.2 Control Panel 6.3 Email 7. FAULT Gu id e 7.1 Fault Codes 7.2 Load Fault 8. R ECOM M EN DED M AIN TEN AN CE SCH EDULE 9. SPECIFICATION S iSTS F1 – User Manual Page 1...
  • Page 4: Safety Instructions

    ▪ Once the connections have been made on the terminals, all terminal covers must be replaced before operation. ▪ Connecting cables must be supported. ▪ Earth connection must be checked for safe function after assembly. iSTS F1 – User Manual Page 2...
  • Page 5: Maintenance Bypass

    1.7 Warranty Static Power operating through its authorised agents warrants that the standard products will be free of defects in materials and workmanship for a period of 24 months after the date of invoice, or such other period as may be specified.
  • Page 6: System Overview & Operation

    2.2 Overview The iSTS is housed in a wall mounted IP54 rated enclosure. Repair is achieved in conjunction with the Maintenance Bypass Switch located at the bottom of the iSTS. iSTS F1 – User Manual Page 4...
  • Page 7: Operational Parameters

    *Due to the nature of the silicone controlled rectifiers used in all static transfer switches, some current must be applied to the iSTS to ensure a clean break during transfers. Overload Capacity Time @45°C 200% 300% 400% 0.1s 2000A 1 cycle 2.4 Line Diagram: Single phase/2-Poles iSTS F1 – User Manual Page 5...
  • Page 8: Operation

    This equipment is not recommended for installation into environments that utilise RCD earth leakage detectors on the inputs of the static transfer switch. Consult Static Power for special considerations. EARTH CONNECTION IS ESSENTIAL BEFORE WORKING ON CIRCUITS OR CONNECTING / DISCONNECTING SUPPLIES.
  • Page 9: Installation

    10.Proceed to section 3.5 Start-up to connect the STS to the load from Maintenance Bypass. When working on live iSTS, be sure to comply with the applicable national standards and accident prevention rules. iSTS F1 – User Manual Page 7...
  • Page 10: Synchronism

    - Supply 1 & 2 are not in synchronism - The unit is too hot (thermal bi-metal switch on H.S. activated) - There is / was an overcurrent/ overload / load fault condition iSTS F1 – User Manual Page 8...
  • Page 11: User Interface

    GREEN if load is Supply 1 ON SUPPLY 2 LED Load is on Supply 2 Load is not on Supply 2 GREEN if load is Supply 2 10 iSTS OUTPUT LED Output is OK Output is faulty GREEN iSTS F1 – User Manual Page 9...
  • Page 12: User Interface Terminals

    6. Turn on Supply 2. Confirm that the STS automatically transfers to Supply 2 after a 3 second delay. On Supply 1 LED will turn green. 7. The operational test is complete. You can now select a preferred supply if any. iSTS F1 – User Manual Page 10...
  • Page 13: Maintenance Bypass

    Maintenance Bypass is at position 1 then the STS portion powering the load should have 1 Green) 4. Finally operate the bypass switch, returning it to the middle position. 5. The unit will now be normal operation mode. iSTS F1 – User Manual Page 11...
  • Page 14: Web B R Owser In Ter Face

    • Setting the preferred supply • Setting the name and location information • Adjusting the time and date • Setting the IP address NOTE: You must press update for the information to be saved on the device iSTS F1 – User Manual Page 12...
  • Page 15: Email

    This is the SMTP server that the unit will use to send the email. You need to provide the Server Address, Server Port, User name or email, and a password. Note: this cannot be an SSL SMTP server. iSTS F1 – User Manual Page 13...
  • Page 16: Fault Gu Id E

    PREF 1/2/OFF Preferred Source Set 1, 2 or none User - Manual Switch Only Contact Static Power – Locks to safe SCR SC SCR on S1 or S2 short circuit detected on Supply 1 or 2 source Contact Static Power – Locks to safe...
  • Page 17: Recommended Maintenance Schedule

    Report / investigate any suspicious entries. ▪ Inspect cable connections for overheating. Contact Static Power for help with troubleshooting and parts replacement. NOTE: The user should not undertake repair procedures or gain access to the internal of the equipment. iSTS F1 – User Manual...
  • Page 18: Specifications

    5 – 95% non-condensing Regulatory approvals IEC 62310-1,2,3 - IEC 60950 - IEC 61000-6-1,2,3,4 – CE – RCM - RoHS Standard warranty 24 months offsite repair or part replacement Specifications are subject to change without notice iSTS F1 – User Manual Page 16...
  • Page 19 STATIC POWER Pty Ltd Post to: Manufactured at: Contact us: ABN 42 101 765 913 Box 2003 5 Candlebark Court +61 3 9437 0494 Research Delivery centre Research, VIC 3095 support@staticpower.com.au Research, VIC 3095 - Australia Australia www.staticpower.com.au iSTS – User Manual...
  • Page 20 STATIC POWER Pty Ltd Post to: Manufactured at: Contact us: ABN 42 101 765 913 Box 2003 5 Candlebark Court +61 3 9437 0494 Research Delivery centre Research, VIC 3095 support@staticpower.com.au Research, VIC 3095 - Australia Australia www.staticpower.com.au iSTS F...

Table of Contents