JLG AM Series Operation And Safety Manual page 27

Table of Contents

Advertisement

SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION, AND INSPECTION
4.
Base Frame - Components properly secured, no loose
wires dangling below base; bubble level in place and
functioning properly.
5.
Tilt Back Assembly - (38AM Models Only) Properly
secured; no parts missing i.e.. safety pins, gas spring
cylinder(s), caster wheels, etc.
6.
Battery/Charger Box Assembly - (DC Voltage
Machines) Proper battery electrolyte level, no cable
corrosion. Battery box pivots freely when machine is
tilted for transporting.
7.
Outrigger Interlock Indicator LED's - See note
above.
8.
Outrigger Sockets - Outrigger lock/release pins in
place and secure, no visible damage. Outrigger inter-
lock contacts (inside outrigger sockets) secure and
clean.
9.
Outrigger Beams - Outrigger interlock contacts prop-
erly installed and clean (on bottom of outrigger
assembly). Leveling jacks secure to the outrigger
assembly, lubricated and functioning properly.
10.
Motor/Pump/Reservoir Power Unit - No evidence of
hydraulic leaks. Check that hydraulic reservoir fluid
level is filled to the "Fill to Line" mark on the side of the
reservoir.
11.
Manual Release Control Valve - See note above.
2-6
12.
Ground Controls - Key switch operable, placards
secure and legible; emergency stop switch, properly
set for operation.
13.
Mast Assembly - Inspect mast chains or cables as per
note above.
14.
Platform Rail Installation - Entry gate/bar in proper
working order.
15.
Platform Assembly - Secure to mast; Control and
power cables properly tensioned and seated in control
cable sheaves; control cable sheaves rotate freely.
16.
Platform Controls - Placards secure and legible,
emergency shut-off button set for operation. Opera-
tors manual enclosed in manual storage tube.
31215708

Advertisement

Table of Contents
loading

This manual is also suitable for:

25am30am38am

Table of Contents