Download Print this page

WE-EF ETC120-FS LED Installation And Maintenance Instructions Manual

Inground luminaire

Advertisement

Quick Links

Do not open during installation
This product is factory-sealed.
Refer to the instructions contained in this
document for details.
Surge Protection
This product features built-in surge protection circuitry in compliance with
applicable standards.
For comprehensive protection of a luminaire installation against lightning and
electrical surges, it is essential to cover mains supply and data input lines at
the distribution board level, by using respective primary (Type 1) and secondary
(Type 2) surge arrestors in compliance with EN61643-11/IEC61643-1.
Warning
Ensure that all required surge protection measures are in place and activated
prior to luminaire installation. Also, disconnect luminaires before operating
high-power devices such as, for example, electrical arc welders.
WE-EF LEUCHTEN
Installation and Maintenance
Instructions
Inground Luminaire
ETC120-FS LED
EVC120-FS LED

Advertisement

loading

Summary of Contents for WE-EF ETC120-FS LED

  • Page 1 WE-EF LEUCHTEN Installation and Maintenance Instructions Inground Luminaire ETC120-FS LED EVC120-FS LED Do not open during installation Surge Protection This product is factory-sealed. This product features built-in surge protection circuitry in compliance with Refer to the instructions contained in this applicable standards.
  • Page 2 Inground Luminaire ETC120-FS EVC120-FS IP67, IK10+, Class I, ta = 40°C...
  • Page 3: Maintenance

    Light Source Maintenance Apart from cleaning the product’s exterior surfaces, no special maintenance work is required. Do not use high-pressure cleaners. In case of component failure due to abnormal circumstances or at end of life, replacement must be carried out Warning: Do not open luminaire while mains supply is switched on.
  • Page 4: Installation Methods

    Installation Installation Methods The product must be installed and maintained by a Attention: The luminaire is factory-sealed and does not need to be opened during installation. building/construction and/or electrical regulations and relevant legislation. For proper installation, use the supplied installation blockout.
  • Page 5 Phase One Phase Two Blockout Installation Procedure Luminaire Installation and Electrical Connection (during earth or masonry work) 4) Switch off mains electrical supply. 1) Ensure a suitable recess is provided to accommo- 5) Check that rating shown on luminaire label conforms date installation blockout/mounting ring assembly with mains electrical supply.
  • Page 6 Fig. III...
  • Page 7 TH0717W DIRECT LUMINAIRE TOWARDS WALL Remove label before operation of luminaire. Fig. IV Fig. V...
  • Page 8 WE-EF LEUCHTEN WE-EF LIGHTING Germany Thailand Tel +49 5194 909 0 Tel +66 2 738 9610 Fax +49 5194 909 299 Fax +66 2 175 2174 info.germany@we-ef.com WE-EF LUMIERE WE-EF LIGHTING France Australia Tel +33 4 74 99 14 44...

This manual is also suitable for:

Evc120-fs led