Download Print this page

Rinnai CRYSTAL Series Operation & Installation Manual page 9

Electric instant water heater

Advertisement

4
6
1
5
7
9
10
15
Non Pump model
1. Heating Element
2. Mouting Holes (4 Nos)
3. Terminal Block
4. Cable Entry
5. Termostat Entry
6. RCD Assembly (for RCD model only)
7. Heater Base
8. Indicator Light
9. Water Tank
3
4
6
2
2
8
1
5
7
9
13
11
12
16
14
15
DC Pump model
10. Electronic Control
11. Triac
12. Flow Switch Assembly
13. RCD TEST RESET
14. Water Inlet
15. Water Outlet
16. Pump Speed Control
17. DC Pump Control Board
18. DC Pump Assembly
4
3
4
7
8
17
18
10
11
12
14

Advertisement

loading

This manual is also suitable for:

Rei-b330npRei-b330dpRei-b380npRei-b380dp