Installation - Genesis 2 Series Manual

Chemical free iron and hydrogen sulfide filtration system
Hide thumbs Also See for 2 Series:
Table of Contents

Advertisement

Installation

Installation Requirements
A level floor position ahead of piping into water heater.
Unit must be installed at least 10 feet ahead of the inlet to a water heater to prevent damage due to back-up hot water.
DO NOT install the unit in an area of direct sunlight or where freezing temperatures may occur!
Locate the unit near an unswitched, 120 volt / 60 Hz grounded electrical outlet.
Check for distance and proper drain installation (e.g. floor drain, washing machine standpipe).
Determine type and size of piping required for filter connection (e.g. copper, galvanized, PVC plastic).
Note: If household plumbing is galvanized and you intend to make the installation with copper (or vice versa), obtain
di-electric unions to prevent dissimilar metal corrosion.
Caution: If sweat soldering copper pipe (remember to always use lead free solder and flux), cover yoke and bypass valve
with wet rags to prevent heat damage to connections and control valve. If using PVC or plastic pipe, primers and solvent
cements specifically recommended for use with potable water are required.
Note: All plumbing lines not requiring "soft" water should be connected "upstream" of the softener, if installed.
(See Typical Installation Diagrams.)
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Genaio10Genaio15Genaio20Genaio25

Table of Contents