Genesis 2 Series Manual

Genesis 2 Series Manual

Chemical free iron and hydrogen sulfide filtration system
Hide thumbs Also See for 2 Series:

Advertisement

Genesis 2 Chemical Free Iron and
Hydrogen Sulfide Filtration System Manual

Advertisement

Table of Contents
loading

Summary of Contents for Genesis 2 Series

  • Page 1 Genesis 2 Chemical Free Iron and Hydrogen Sulfide Filtration System Manual...
  • Page 2: Table Of Contents

    General Specifications............. Page 3 Installation................. Page 4 Utilizing Bluetooth..............Page 8 Programming the Control Valve..........Page 11 Control Valve Powerhead Assembly........Page 14 Valve Body Assembly............... Page 15 Bypass Assembly..............Page 17 Service Instructions..............Page 18 Troubleshooting................ Page 19 Error Codes................Page 20 Warranty Information...............
  • Page 3: General Specifications

    General Specifications General GENAIO10 GENAIO15 Specifications Filtration Media CATALYTIC CARBONSMART BLEND ™ Filter Media Capacity (cu ft) 9 X 48 Mineral Tank 10 X 54 Service Flow Rate - Continuous (gpm) Service Flow Rate - Intermittent (gpm) Backwash Flow Rate (gpm) Gallons Used / Backwash 9 X 9 X 56 Space Required...
  • Page 4: Installation

    Installation Installation Requirements A level floor position ahead of piping into water heater. Unit must be installed at least 10 feet ahead of the inlet to a water heater to prevent damage due to back-up hot water. DO NOT install the unit in an area of direct sunlight or where freezing temperatures may occur! Locate the unit near an unswitched, 120 volt / 60 Hz grounded electrical outlet.
  • Page 5 Install inlet and outlet piping in direction of arrows. It is recommended that a vacuum breaker be installed on the inlet plumbing. Genesis 2 Bypass - Shown - Drain Line Connection - 1. The drain line flow control assembly is pre-assembled for your convenience. Should you choose to hard plumb the drain line, please remove the barb fitting.
  • Page 6 Model Relay only. Not used on non Ozone model) - System Start Up Procedure- Genesis 2 Bypass - Shown IMPORTANT NOTE: Tank should be filled with water and media must have been soaking for at least 1 hour before initial pressurization.
  • Page 7 Installation - Final Checkout - 1. Be certain that the bypass valve is in Service position and main valve is completely on. 2. Check electrical supply to be certain the cord is connected to an uninterrupted 115 volt outlet. IMPORTANT NOTICE - The plumbing system, piping, pressure tank, hot water tanks, softeners, etc. that have been exposed to iron bearing water may need to be cleaned of the precipitated iron that has been collected in them or iron bleed thru may be a problem.
  • Page 8: Utilizing Bluetooth

    ® Utilizing Bluetooth Control For simplified set up and control, please install the Legacy View on a compatible Bluetooth 4.0+ enabled smart phone or tablet. 1. Download and install the Legacy View app from the Google Play Store, Apple App Store. 2.
  • Page 9 Set Up Utilizing Bluetooth ® Change Time of Day (Press “SET” to set time automatically based on device). For Filters: Set Backwash Frequency This sets the amount of day between backwash cycles Set Regeneration Time Example: For 2a.m., just type 2, choose a.m., and press ‘OK’ Note: If you have a filter and a softener the valves should be set to regenerate at different times.
  • Page 10 Set Up Utilizing Bluetooth ® Status and History From the Status and History, all items in ORANGE can be reset. Pressing this icon will show a list of the data that is in the graph. Touch any graph to enlarge and see details.
  • Page 11: Programming The Control Valve

    Programming the Control Valve Normal Operation 1. Home Display a. Alternates between the display of Time of Day and Number of Days until the Next Backwash. (Metered softeners will alternate between time of days and gallons remaining until next regeneration) - Days Remaining until the Next Backwash will count down from the entered value until it reaches 1 day remaining.
  • Page 12 Programming the Control Valve Main Menu 12:00 1. To enter Main Menu, press the Menu/Enter button. (Time of Day will flash) 2. To set the Time of Day, press the Set/Change button. (First digit will flash) Example (12:00) To change digit value, press the Set/Change button. To accept the digit value, press the Menu/Enter button.
  • Page 13 Programming the Control Valve Note: Depending upon system pressure and other factors, it is possible to observe flow to drain in the rest cycle. -When the valve is between positions, the display will flash the number of the step it is moving towards. -The default time at which regeneration will occur is 12:00 a.m.
  • Page 14: Control Valve Powerhead Assembly

    Control Valve Powerhead Assembly LETTERS IN DIAGRAM REPRESENT WIRING CONNECTIONS DESCRIPTION PART NO. Powerhead Assy. 20010X100 Circuit Board Assy. 20010X101 Encoder 20001X124 Front Plate 20001X004 Encoder Wheel 20001X007 Main Gear 21001X120 Power Supply 20001X125 Back Plate 20001X005 Lower Front Base For Cover 20111X002 Legacy View Motor Assy.
  • Page 15: Valve Body Assembly

    Valve Body Assembly...
  • Page 16 Valve Body Assembly DESCRIPTION PART NO. Final Rinse Piston Assembly 20009X231 10-24 X 3/4” Screw SST 20001X001 Seal and Spacer Kit Incl (5) #3 & (4) #4 20561X253 End Spacer Flow Control Button 5.0 GPM 20251X272 Flow Control Button 7.0 GPM 20251X273 DLFC Housing 20017X268...
  • Page 17: Bypass Assembly

    Bypass Assembly DESCRIPTION PART NO. D15 Bypass (optional non stock) 20017X283 1” NPT Elbow Set (optional non stock) 20017X284 1” Female Straight Slip Set (optional non stock) 20017X288 1” NPT Straight Set (included with all units) 20017X289 3/4” NPT Straight Set (included with all units) 20017X307 3/4”...
  • Page 18: Service Instructions

    Service Instructions / Instructional Videos Available at www.discountwatersofteners.com General Preliminary Instructions PERFORM BEFORE ALL SERVICING OPERATIONS 1. Turn off water supply to conditioner. - If the conditioner installation has a “three valve” bypass system, first open the valve in the bypass line, then close the valves at the conditioner inlet and outlet.
  • Page 19: Troubleshooting

    Troubleshooting Guide To Replace Meter 1. Follow steps A1 - A3. 2. Unplug meter cable from front of circuit board. 3. Unscrew meter assembly nut from valve body. 4. Remove meter from valve body and clean or replace as necessary. 5.
  • Page 20: Error Codes

    Error Codes Control Valve Error Code Diagnosis Under normal operating conditions, when your control valve is in the “in service” position, the display should alternate between the current time of day and the number of days remaining (for filters and time clock softeners) or gallons remaining (for metered softeners) until the next regeneration.
  • Page 21: Warranty Information

    Warranty WATER TREATMENT EQUIPMENT • If the tank is not the size indicated for the supply line size of the installation, as described in the manual. This warranty cannot be transferred - it is extended only to the original • To any failure or malfunction resulting from abuse (including freezing), improper or negligent;...

This manual is also suitable for:

Genaio10Genaio15Genaio20Genaio25

Table of Contents