Figure 3 – Rigging the Unit, Sizes 120-200
20
Installation - Mechanical
Special Lifting and Moving
Instructions
A specific lifting method is
recommended as follows:
1. Lifting points are built into the
unit. (There are four lifting points
for RTAC 120-200, and eight
lifting points for RTAC 230-400.)
2. Slings and spreader bar to be
provided by rigger and attached
to the lifting points.
3. Minimum rated lifting capacity
(vertical) of each sling and
spreader bar shall be no less than
the tabulated unit shipping
weight.
RTAC
120 HE - 140 SE
120 XE
130 HE - 155 SE
130 XE
140 HE
140 XE
155 HE
155 XE
170 SE
170 HE
175 XE
185 SE
185 HE
185 XE
200 SE
200 HE
200 XE
CAUTION
4.This unit must be lifted with the
utmost care. Avoid shock load by
lifting slowly and evenly.
Container Pull Out Hook
Maximum Shipping Weight
L
A
Aluminum
5041
4000
4363
5041
4000
4677
5041
4000
4411
5041
4000
4604
5041
4000
4427
5041
4000
4511
5960
4000
5071
5960
4000
5242
5041
4000
4692
5960
4000
5310
6879
4000
5722
5960
4000
5257
6879
4000
5885
6879
4000
6174
5960
4000
5367
6879
4000
5984
6879
4000
6364
Copper
4957
-
5046
-
5087
-
5784
-
5356
6078
-
5970
6709
-
6134
6864
-
RLC-SVX02G-E4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents