Yardline OAKRIDGE 8 x 12 Assembly Manual page 27

244 x 366 cm
Table of Contents

Advertisement

PARTS REQUIRED:
x1
OO
1-1/4 x 2-1/2 x 69" (3,2 x 6,3 x 175,3 cm) TEMPORARY SUPPORT
x2
3/8 x 19-5/8 x 72" (1 x 49,8 x 182,9 cm)
3
Place 19-5/8" x 72" panel onto wall frame flush to SZ with primed
side up as shown.
Secure panel with two 2" nails 6" (15,2 cm) apart.
4
Repeat step 3 to attach the remaining panel.
5
Use OO as a brace to maintain 56" (142,3 cm) opening. Use
two 3" screws to attach.
19-5/8"
(49,8 cm)
72"
(182,9 cm)
FRONT WALL
For squareness maintain flush
Flush
6"
(15,2 cm)
Maintain 56" dimension
Maintain
Flush
Install OO after panels
for temporary brace.
Primed
side up
x2
along panel edges.
56"
(142,3 cm)
25
3" (7,6 cm)
x40
2" (5,1 cm)
19-5/8"
(49,8 cm)
Flush
6"
(15,2 cm)
Maintain
Flush
Primed
side up
72"
(182,9 cm)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents