Download Print this page

Advertisement

Quick Links

16753
STOP!
STOP!
For immediate help with assembly or product information
call our toll-free number:
1--800-844-9273
or email:
Our staff is ready to provide assistance.
April through October M - F 8:00
to 8:00
EST
AM
PM
Saturday 8:30
to 4:30
EST
AM
PM
November through March M - F 8:00
to 5:00
EST
AM
PM

Advertisement

loading
Need help?

Need help?

Do you have a question about the STOCKTON 8' x 12' and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Yardline STOCKTON 8' x 12'

  • Page 1 16753 STOP! STOP! For immediate help with assembly or product information call our toll-free number: 1--800-844-9273 or email: Our staff is ready to provide assistance. April through October M - F 8:00 to 8:00 Saturday 8:30 to 4:30 November through March M - F 8:00 to 5:00...
  • Page 2 (This page intentionally left blank.)
  • Page 3: Before You Begin

    11/5/2013 16753 ASSEMBLY MANUAL A Backyard Products Company STOCKTON 8' x 12' (243,8 x 365,8 cm) Customer Service 1-800-844-9273 Includes 8' x 12' Building and Floor Instructions 1000 Ternes Drive Monroe, MI 48162 KEEP THIS MANUAL FOR FUTURE REFERENCE Building 8' x 12' (243,8 x 365,8 cm) IMPO RTAN T! READ INSTRUCTIONS THOROUGHLY PRIOR TO BEGINNING ASSEMBLY.
  • Page 4 Required Optional ❑ Chalk Line ❑ Phillips ❑ Tool Belt/ Screwdriver Nail Pouch ❑ Drill / Driver ❑ Utility Knife ❑ Safety Glasses ❑ 3/8" Drill Bit ❑ Shingle Blades ❑ #2 Philips Drive Bit ❑ Hammer ❑ Caulk Gun ❑...
  • Page 5: Additional Materials

    ADDITIONAL MATERIALS FOUNDATION OR FLOOR MATERIALS • This shed kit includes a complete wood fl oor system. • It does not include ANY leveling materials. • See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your fl...
  • Page 6: Parts List

    PARTS IDENTIFICATION AND SIZES Part identification is WOOD SIZE CONVERSION CHART stamped on some parts. Nominal Board Size Actual Size 2" x 4"....1-1/2" x 3-1/2" (3,8 x 8,9 cm) 1" x 4"....3/4" x 3-1/2" (1,9 x 8,9 cm) 2" x 3"....1-1/2" x 2-1/2" (3,8 x 6,3 cm) 1"...
  • Page 7 WALL PANEL & DOOR PARTS LIST NOTE: Panel parts are not stamped with part identification. 3/8 x 43-1/16 x 48" 3/8 x 43-1/16 x 48" 3/8 x 43-1/16 x 48" 3/8 x 43-1/16 x 48" (1 x 109,4 x 121,9 cm) (1 x 109,4 x 121,9 cm) (1 x 109,4 x 121,9 cm) (1 x 109,4 x 121,9 cm)
  • Page 8 DOOR HARDWARE (Not actual size) WINDOW VENT 9 x 31" (22,9 x 78,7 cm) 1-1/2" (3,8 cm) 1/2" (1,3 cm) T-HANDLE 1-1/2" (3,8 cm) 3/4" (1,9 cm) NAIL BOXES 3" (7,6 cm) BOXES BOXES 2" (5,1 cm) FASTENER/HARDWARE BAG x 125 2"...
  • Page 9 There are multiple ways to level your floor frame. Our recommended leveling method is shown below. Leveling materials are not included in this kit. PREFERRED METHOD - 4x4 TREATED RUNNERS 3" (7,6 cm) Screws angled into 4x4. (2) at each point frame and 4x4 touch.
  • Page 10 CONCRETE FOUNDATION Your kit contains all materials to construct a wooden floor. If you choose to install your kit on a concrete slab refer to the diagram below. Treated Sill Plate Caulk between sill plate and concrete. 3-1/2" (8,9 cm) 4"...
  • Page 12 FLOOR FRAME LEVEL AND SQUARE FLOOR FRAME Before attaching fl oor decking, it is important to level and square the fl oor frame. A level and square fl oor frame is required to correctly construct your shed. ¸ BEGIN See page 7 for the preferred fl oor leveling method. Use level and check the frame is level before applying fl...
  • Page 15 IMPORTANT! I M P O R T A N T ! Check the floor frame is level after installing floor panels. Re-level if needed. The floor should be used as a stable work surface for wall construction. HINT: Organize your assembly procedure during the build process to avoid over-handling of the walls.
  • Page 50 PAINT & CAULK - NOT INCLUDED - rylic latex caulk that is paintable. Caulk at all horizontal and vertical seams, between the trim and walls, and all around the door trim. exterior acrylic latex paint. When painting your building, there are a few key areas that can be easily overlooked that must be painted: Note: Prime all un-primed exterior wood before painting.
  • Page 51 SHINGLES - NOT INCLUDED - r vided by man amiliarize y Tab Shingle SHINGLE NAIL PATTERN 1/2" 1" Sealing Strip 1" (1,3 cm) (2,5 cm) (2,5 cm) NAILS NEVER DRIVE ASTENERS INTO OR ABO BEGIN Install first starter row upside down and color up with a 1" overhang at back and bottom of roof panel. Use (4) nails per shingle.
  • Page 52 SHINGLES continued... Install second row of shingles flush at top of first row's rain slots. Ensure 1" overhang or flush to drip edge at front, stagger each row. BACK OF FRONT OF SHED SHED Bend in roof 1" (2,5 cm) Notch Flush with rain slots.
  • Page 53 SHINGLES continued... After shingles are installed over bend, nail down overlap using two roofing nails per tab. (2) Nails per tab Continue installing rows of shingles to the peak. At the peak make sure there is a maximum of 5" or less to the rain slot, as shown below.
  • Page 54 SHINGLES - RIDGE CAP You will finish off the top of the roof with a ridge cap made from shingles. BEGIN Cut shingles into THREE pieces. Hint: Use cut-off pieces first. 2" 2" (5 cm) (5 cm) 2" 2" 2" 2"...
  • Page 55 SHINGLES - RIDGE CAP continued... Continue installing ridge cap to back of roof. Make sure there is 4" between the shingle-color and edge of shingles. 4" (10 cm) Trim cap off flush to shingles When you have 4" minimum of shingle color cut one piece to cap your roof. Cut at top of rain slot.
  • Page 56 WARRANTY B a cky a rd S tor a ge S ol u tion s , LLC w a rr a nt s the following: Limited Conditional Every prod u ct i s w a rr a nted from defect s in workm a n s hip a nd m a n u f a ct u ring for one ye a r. Warranty * All h a rdw a re a nd met a l component s a re w a rr a nted for two ye a r s .