Download Print this page
ZKTeco HBL100 Installation Manual

ZKTeco HBL100 Installation Manual

Double latch

Advertisement

Quick Links

Installation Guide
HBL100/HBL200 (Double Latch)
Version: 1.0
Date:June2019

Advertisement

loading

Summary of Contents for ZKTeco HBL100

  • Page 1 Installation Guide HBL100/HBL200 (Double Latch) Version: 1.0 Date:June2019...
  • Page 2: Table Of Contents

    Important Notes v Please read all instruction in this manual or call customer care before returning the product to the store. v The contents of this guide may vary without any notices to improve the performance of this product. v Customer's improper installation may result in a additional service costs. We highly recommend professional installation.
  • Page 3: What's In The Box

    What’s in the Box Mounting Outdoor unit Indoor unit Strike Gasket Strike plate Lithium Battety Keys plate Hex wrench Latch 30-37mm 38-45mm 46-53mm 54-60mm Door Thickness 64mm 72mm 80mm 88mm Spindle Screw A Screw B Screw C 40mm Note: To ensure proper functioning of the lock, use the correct set of screws and spindle according to your door thickness.
  • Page 4: Installation Diagram

    Installation Diagram Battery Cover Lithium battery Indoor unit Door Mounting Screw B plate Gasket Screw C Gasket Outdoor unit Spindle Latch Strike Strike plate Cover Screw A Keys...
  • Page 5: Installation Preparation

    Installation Preparation 1. Check door thickness. After measuring the door thickness, select the proper spindle and screw length. For details, please refer to the table contents of page 1. 2. Check door opening direction. The handle of the door is determined by the swing (handing) direction of the door. Below is the graphical representation of handing in reference to your location outside the room.
  • Page 6: Installation Steps

    Installation Steps RecommendedInstallationHeight 1. Drilling holes in the door. 1) Paste the installation template at a desired handle If the user height is 1.6-1.8m, the height height. from handle centerline to ground is 1m. 2) Mark the holes and start drilling the holes. center line of handle desired handle height 0.5m...
  • Page 7 2. Installing the latch. Change latch direction. (if needed) Secure the latch by inserting the screws A. 1. Push the reversing block down. 2. Push the latch bolt into mortise. Screws A 3. Rotate the latch bolt at 180° inside mortise, then loose it.
  • Page 8 3. Installing outdoor unit on the door. 1. Attach the gasket to the outdoor unit. Route cable and attach the outdoor unit to the door 2. Insert spindle into the clutch. by inserting it through the drilled holes. Clutch c orrect p osition: T he triangle must be vertically centered.
  • Page 9 4. Installing mounting plate with gasket on the door. Attach the mounting plate to the gasket and route Place the gasket and mounting plate on to the cable through the hole on the mounting plate the door and use screws C to secure them. and gasket.
  • Page 10 5. Installing the indoor unit. Connect the cable connector to the port on indoor unit. Place the indoor unit properly on the mounting plate. Then use screw B to secure indoor unit. Screws B...
  • Page 11 6. Insert batteries. 7. Mark and drill holes for the strike box and plate. Insert the lithium battery and 1. Make sure that the strike box is in level of latch bolt, then use install the battery cover. installation template to drill holes. Align the strike box and plate with the drilled hole and use Note: Eight alkaline batteries are optional.
  • Page 12 8. Testing the lock. Test the lock from outdoor by rotating the Test the lock by using the mechanical key. handle. 1) Remove the cover on the mechanical key hole. 2) Insert the key and rotate 90° to the left or right. Note : When the door is l ocked , the front 3) Turn the handle handle can be turned, but the door will...
  • Page 13: Change Handle Direction

    Change Handle Direction 1) Use hex wrench to re move screw. 3) Change handle direction a nd replace. 4) S  ecure using the screw. 2) T ake the handle out from the lock.
  • Page 14 ZKBuildingWuhe Road, Gangtou, Bantian, Buji Town, Longgang District, Shenzhen China 518129 Tel: + 86 755-89602345 Fax: + 86 755-89602394 www.zkteco.com Copyright©2019 ZKTeco CO., LTD. All rights reserved.

This manual is also suitable for:

Hbl200