Assembly - ProGear Air Elliptical 1307 Owner's Manual

Hide thumbs Also See for Air Elliptical 1307:
Table of Contents

Advertisement

ASSEMBLY

TOOLS
Open-Ended Flat Wrench
STEP 1
1A Installing The Front Stabilizer: Ensuring that the ARROW STICKER IS POINTING UP so that
the Transport Wheels (93) are parallel to the floor, align the holes of the Front Stabilizer (54) to
the curved bracket at the front end of the Mainframe (59). Insert two Bolts (52) through the Front
Stabilizer (54) and secure with two Curve Washers (55) and two Cap Nuts (56). Using the
Open-Ended Flat Wrench, tighten the Cap Nuts (56) until they are secure.
1B Installing The Rear Stabilizer: Align and attach the Rear Stabilizer (62) to the bracket located
at the bottom of the back end of Mainframe (59) with two Bolts (52). Secure the two Bolts (52)
with two Curve Washers (55) and two Cap Nuts (56). Using the Open-Ended Flat Wrench,
tighten the Cap Nuts (56) until they are secure.
HARDWARE PACK
(55) Curve Washer
(52) Bolt
(56) Cap Nut
4PCS
4PCS
4PCS
10

Advertisement

Table of Contents
loading

Table of Contents