Download Print this page
Quail Digital Pro11 Installation Manual

Quail Digital Pro11 Installation Manual

Headset system
Hide thumbs Also See for Pro11:

Advertisement

Quick Links

Pro11
Pro11 Headset
Q-P11HS

Headset System

Installation Manual
Pro11 Base Station
Q-P11BS
Pro11 Charger
Q-P11CH

Advertisement

loading
Need help?

Need help?

Do you have a question about the Pro11 and is the answer not in the manual?

Questions and answers

Summary of Contents for Quail Digital Pro11

  • Page 1: Headset System

    Pro11 Headset System Installation Manual Pro11 Headset Pro11 Base Station Pro11 Charger Q-P11CH Q-P11HS Q-P11BS...
  • Page 2 STEP 1 STEP 2 • • The base station can be located in Set up the 6-port battery charger. either the OR or the monitoring room. Select a clear desk or cabinet top in the monitoring room close to a 230/240v •...
  • Page 3 STEP 3 STEP 4 • • Place a battery into each headset, by To register a headset to the base station, removing the outer sleeve on the body of take one headset at a time out of the the headset using your fingernail. charger and hold the outside face of the (figure 4) headset to the bottom of the base.
  • Page 4 Useful information • If you have multiple ORs and multiple Pro11 systems you can move headsets from one room to another by following Step 4 overleaf. When a headset is registered to another base station it automatically deregisters from the previous one.