Commissioning - ProFlow PF-MMX Installation & Operating Instructions Manual

Multi purpose water filter
Hide thumbs Also See for PF-MMX:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 3
ELECTRICAL
1. Connect the appliances power cord to the transformers
output.
2. Plug the transformer into an electrical outlet.
PRESSURIZING
1. Put the bypass system in 'bypass' position.
2. Make sure the electronic controller of the appliance is in
service mode.
3. Open the mains water supply.
4. Open a cold treated water faucet nearby the appliance
and let the water run for a few minutes until all air is
purged and all foreign material that may have resulted
from the installation is washed out; close the tap.
5. Gently pressurize the appliance, by putting it into service:
close the 'BYPASS' valve;
open the 'OUT' valve;
slowly open the 'IN' valve.
6. After 2-3 minutes, open a cold treated water faucet
nearby the appliance and let the water run for a few
minutes until all air is purged from the installation and the
resin bed is rinsed (it is normal for the rinse water to show
some discoloration!); close the tap.
7. Check the appliance and all hydraulic connections for
leaks.
ELECTRONIC CONTROL PANEL
1. Program the electronic controller.
INITIATE A REGENERATION
1. Manually initiate a regeneration, by pressing the scroll
button; the display will show:
Regen in 10 sec
2. Leave the appliance in this position; the count-down
timer will count down to 0 sec and start a regeneration;
to save time you may skip, or terminate prematurely, the
second cycle of the regeneration by pressing the scroll
button once, as soon as the display indicates that the
system is in the second regeneration position.
EN - English

COMMISSIONING

Page 8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pf-bta

Table of Contents