Maintenance
Daily Maintenance
Before powering up the hot melt system perform the fol-
lowing checks.
1.
Inspect the melt tank for foreign materials and/or
charring of the adhesive. Wipe off all excess adhe-
sives from all surfaces with purging compound
118090.
2.
Check the hoses, applicator heads, and nozzles for
wear and ensure integrity of all electrical connec-
tions.
3.
Verify the hose is being properly supported so it is
not stressed during use. The minimum bend radius
is 16 in. (40.64 cm) when hot.
4.
Look for leaks under the melt unit and at all
mechanical connections.
309832D
Tank Screen Inspection
A screen 118211 is located at the bottom of the tank to
prevent contaminants from damaging the pump assem-
bly. Inspect and clean screen on a regular basis. Inspect
when tank is close to or is empty of material. See Flush-
ing, page 14.
Maintenance
19