PE Busbar
Lifting a Double Roof
ACA 6xx Sections and ACS/ACC 6x7 (132 to 3000 kW) Frequency Converters
The PE busbar connection is shown below.
When the drive is equipped with a double roof:
1
1. Lift the upper part of the roof plate up from the transportation
position.
2. Lock the roof to its final position with the M6 screws.
Chapter 2 – Mechanical Installation
Joint piece
M10
Tightening
torque:
35–40 Nm
(25–30 ft.-lbs.)
2
2-15