Page 1
QUICK BGA 2025 BGA/CSP Rework Station Operation Manual Thank you for purchasing our BGA/SMD Rework System. The system is exclusively designed for reworking and soldering SMD component. Please carefully read this manual before operating the system. Store this manual in a safe, easily accessible place for future reference.
Page 2
QUICK2025 manual operation 1. Summary Thank you for using QUICK BGA2025 Rework System. This system, which adopts microprocessor control and infrared sensor technology to solder and de-solder to surface mount components safely and accurately. It also can control the whole technical process and record all the information by means of the BGA Software, thus satisfying the higher technical demands of modern electronic industry.
QUICK2025 manual operation 2. Product Picture LCD Display Screen Power Switch TOP Heater PCB Fixture Fixture Fixing Knob Keyboard 3. The unit is supplied with: Please check whether the following parts are included and intact. * Main Unit BGA2025 * Sirocco nozzle * PC and LCD Display Screen * BGA2025 Operation Manual * K-type sensors...
QUICK2025 manual operation 4. Safety Instructions Note: For the safety of the system and operator, please read this manual carefully before operating the unit. Please note that the unit is suitable for soldering and de-soldering of electronic components. Note: Top and bottom infrared heater and sirocco nozzle will be very hot during working, so explosive and combustible object or gas and solvent is strictly prohibited in working areas, also please don’...
QUICK2025 manual operation 14.LED lighting White LED (lower side), Red LED (upper side) (with adjustable brightness) ±0.025mm 15. Paste Precision 16.Paste force 1.5N 17.Power Supply 220V/230V AC、 50/60HZ、 3500 5.2 Technical Parameter Main Interface: TL: Melting temperature of the solder T1: starting temperature of heat preservation in the reflow soldering process T2: ending temperature of heat preservation in the reflow soldering process T3: Peak value temperature of the soldering and de-soldering process...
* Check the package of the equipment is good or not. * Take out the QUICK BGA 2025 rework system from the package and place it on the solid working desk. * Check every unit is good or not. If not, please replace the unit from our company or agents in time.
QUICK2025 manual operation 6.2 Install the LCD 1. Take out the LCD carefully from the package, back out the base of the LCD and then unscrew the four fixed screws. 2. Install the fixing board to the LCD and screw down the fixed screws. 3....
Page 8
QUICK2025 manual operation To the monitor interface or the video interface To the interface RS232 To the power of the PC supply socket Turn on the switch of the power supply after connecting all the units and cords. 7、Parts Instruction SENSOR The system has five K type sensors checking the temperature of the point in the PCB, such as the temperature of BGA surface, bottom temperature of the PCB, real temperature of the tin ball.
Page 9
QUICK2025 manual operation DISPLAY WINDOW LCD display window shows all the information and data of the system. Users can see clearly parameters in the all interfaces and the position Display window information of the every part. Display the relevant information with the process running. Air blow meter APERTURE ADJUSTING The aperture system of the top infrared heater is adjustive from 20mm*60mm to 60mm*60mm by one...
Page 10
QUICK2025 manual operation Note: Adjusting the aperture system can protect the adjacent components on the PCB from being heated. But when the aperture system is adjusted to too small size, the top heater will become very hot when working continuously. So it’s necessary to increase the size appropriately to avoid cutting off the life of the heater.
Page 11
QUICK2025 manual operation * PCB Fixture ● Movable PCB fixture is able to fix PCB with different size. It has four lock knobs and two micro-adjusting knobs. Two PCB lock knobs are used for locking PCB Fixed Bar to prevent it from moving the PCB. The other two Fixture Lock Knob is used for locking orbit to prevent fixture from moving.
Page 12
QUICK2025 manual operation Keyboard A、 control the cursor moving to left or right and data modifying with UP、 DOWN、 LEFT、 RIGHT key at any interface B、 Function of the “SET” key is confirming the input information and function of the “SAVE” key is saving the information and than exiting the process.
Page 13
QUICK2025 manual operation ● Aligning arm is controlled by the “CAM-CON” key. Pressing “CAM-CON” key, when the aligning arm is in side, it will move automatically from inner to outer and stop in one line with the top heater, and when the aligning arm is outside, it will do the opposite action to the initial state.
QUICK2025 manual operation 8、Parameters Setting Interface Setting ( ) A.MAIN current process setting B. SYSTEM ( ) system setting ( ) C.DATA parameters setting A、 MAIN Current Process Setting(with keyboard) It is necessary and must to adjust the parameters when de-solder firstly PCB and BGA. Operation steps are as follows.
Page 15
QUICK2025 manual operation B、System Setting: System setting includes password setting, alarming setting, setting controlling switch state of out side parts of the bottom infrared tubes, baud setting. 1) Press “RIGHT” key to the system setting interface in the MAIN interface. 2) Press “SET”...
Page 16
QUICK2025 manual operation Parameter Setting of the DATA Interface C、 Press “SET” key and select the “DATA”, and then press “SET” again to setting the parameters. Now the cursor is on the selecting item and the method of the setting the parameters as the example one. “DATA” interface will show the ten processes in the host machine.
Page 17
QUICK2025 manual operation The soldering technics is decided by T0、 TB1、 TB2、 T1、 T2、 T3、 S1、 S2 and S3. It describes the temperature graph during the period of the system working. TL means Melting temperature of solder and the range between T2 and T3.
Page 18
QUICK2025 manual operation in the range of 0~300s. TIR、 KTB TIR:the setting heating temperature of the bottom heating tubes; KTB:Real-time temperature of bottom sirocco heating, correspond to TB 底部热风实际温度,相当于 TB KIR、 IRT KIR:Real-time temperature of bottom infrared heating IRT:Real-time detecting temperature of the infrared sensor TB、...
Page 19
QUICK2025 manual operation PCB between Top heater and Bottom heater (the soldered elements have been placed on the PCB board by PL system). The position of the soldered BGA must be corresponding with the position of the sirocco nozzles. 3. Adjust aperture system for getting a proper window size. 4....
Page 20
QUICK2025 manual operation monitor. Aligning adjustment refers to “Adjustment knobs” and “PCB Fixture”. 8. After alignment, aligning arm goes back to initial position when pressing “CAM-CON” key. Paste the chip automatically when pressing “PASTE”. The aligning process is over and it’s the time to 9....
Page 21
QUICK2025 manual operation 1、Suck Process begin(pressing “SUCK” when the system in idle) Top heating arm up to top Nozzle up to top Alignment arm turn to outwards Top heating arm downwards Delay one second Top heating arm stop downwards Nozzle downward Is the Nozzle switch touched? Open pump...
Page 22
QUICK2025 manual operation Heating arm up to top Is the Nozzle switch closed? Is the Nozzle switch touched? Close pump Delay one second Heating arm up to top Nozzle up to top NOTE: Process runs from B after pressing “EXIT” key at any time in sucking process. After closing the sucking switch, the sucked elements must be taken away before closing the pump switch.
Page 23
QUICK2025 manual operation 2.Paste process: begin(pressing button “BEGIN” when the system in idle) Alignment arm turning and moving Nozzle downward Nozzle switch be touched or down to bottom? Is the Nozzle switch touched? Nozzle upwards Delay two seconds Nozzle stop upwards Heating arm downwards Is the Nozzle switch touched?
Page 24
QUICK2025 manual operation Delay one second Heating arm up to top Nozzle downwards Nozzle switch be touched or down to bottom? Close the pump Delay one second Nozzle up to top NOTE: Process runs from C after press “EXIT” button at any time in the process. Page 23...
Page 25
QUICK2025 manual operation 3. Desolder Process begin(pressing button “BEGIN” when the system in idle) Close cooling fan、pump、bottom sirocco Alignment arm moving Bottom sirocco heating as TB1 setting Bottom infrared heating as TIR setting Nozzle up to top Heating arm downwards Pressing up and down adjusting button heating arm or not? of the...
Page 26
QUICK2025 manual operation Control calefactive temperatureT0-T1 Top temperature is bigger than T1 and up to time? Control calefactive temperatureT1-T2 Top temperature is bigger than T3 and up to time? Bottom sirocco heating as TB2 setting Control calefactive temperatureT2-TL Top temperature is bigger than TL? With sound hint or not Page 25...
Page 27
QUICK2025 manual operation Control temperature TL-T3 Top temperature is bigger than T3 and up to time? With sound hint or not Stop nozzle Control constant temperature on TL-T3 Stop sound De-solder process or not? Nozzle downwards Touch the sucking switch? Open pump Nozzle down to bottom?...
Page 28
QUICK2025 manual operation Heater arm upwards Delay one second Heater arm stop upwards No heating on top, No sirocco heating on bottom Delay 50seconds Stop counting delay time Heating arm up to top Note: After the heating process, run the process from E ” after sucking the chip when pressing button “EXIT”.
QUICK2025 manual operation Calibrating the System Due to vibrations during transporting, it is necessary to calibrate the system before using. The steps are shown as follows. Checking the Calibration 10.1 1. Insert the calibration plate into the PCB fixture and adjust the position, lock the fixture. 2....
QUICK2025 manual operation 4. Adjust the two adjusting screws on the alignment arm until the two round images on the display superpose. 5. After superposing, screw down fixing screws on left side. After screwing down, the image displayed should be superposed too. 6....
Page 31
QUICK2025 manual operation Clean the prism of camera with pledget and be careful not to scrape it. Use the towel with cleaning oil to clean PCB fixture and orbit. Replace Suction Pad: If you want to replace the Suction Pad, please turn off power, and replace it after the vacuum suction nozzle and Top Heater cooling down.
Need help?
Do you have a question about the BGA 2025 and is the answer not in the manual?
Questions and answers