Wiring Devices To The Appcontroller's Rnet Port; Rnet Wiring Specifications - Carrier AppController OPN-APP Installation And Startup Manual

Table of Contents

Advertisement

Connect the binary output wiring to the screw terminals on the AppController and to the controlled device.
4
Insert the power screw terminal connector into the AppController's power terminals.
5

Wiring devices to the AppController's Rnet port

The Rnet communicates at a rate of 115 kbps and should be wired in a daisy-chain or hybrid configuration.
Supports up to
10 wireless and/or ZS sensors (5 per control program)
One Equipment Touch
One TruVu™ ET Display
NOTE ZS sensors, a Wireless Adapter, and an Equipment Touch can share the Rnet, but not SPT sensors.

Rnet wiring specifications

NOTE Use the specified type of wire and cable for maximum signal integrity.
Description
Conductor
Maximum length
Insulation
Color Code
Shielding
UL temperature rating
Voltage
Listing
AppController
Installation and Start-up Guide
4 conductor, shielded or unshielded, CMP, plenum rated cable
22 AWG (7x0096) bare copper if Rnet has only sensors
500 feet (152 meters)
Low-smoke PVC (or equivalent)
Black, white, green, red
If shielded, Aluminum/Mylar shield (100% coverage) with TC drain wire, terminated
at controller
32–167°F (0–75°C)
300 Vac, power limited
UL: NEC CL2P, or better
11
Installing the AppController
CARRIER CORPORATION ©2019
All rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents