2. After verifying the installation, reinstall all
the covers.
3. (Remove the paper protective film from the
sealing putty.) After routing cables and
verifying cable connections, seal the gap
between cables and the cabinet using
sealing putty.
Sealing putty must be used as a whole and
the gap can be sealed only from the top.
Paper
protective film
5

Powering On and Starting the UPS

1. Before powering on the UPS, ensure that the UPS has passed all check items in the UPS5000
Commissioning and Acceptance Report and Chapter 4.
2. Measure the voltage and frequency of the UPS upstream input switch. The line voltage range is
138–485 V AC, and the frequency range is 40–70 Hz.

Powering On the UPS

5.1
(Full configuration model) Close the UPS bypass input switch, output switch, and mains input switch.
After the UPS is powered on, initialization begins. The MDU displays the Huawei logo and an
Sealing putty
Close the upstream bypass and mains input switches.
initialization progress bar.
4. Do not remove the dustproof cover before
power-on to prevent dust inside the UPS.
Dustproof cover