Boiler positioning and levelling
Fig. 2
1. Insert adjusting screws
Note
The adjusting screws and sight glass closure can
be found inside the combustion chamber.
2. Level the boiler horizontally. No special founda-
tions are required.
D
into the base rails.
D
Note
We recommend positioning the boiler on anti-vibra-
tion boiler supports
C
adjusting screws
will not be required.
D
(see Fig. 1), in which case