Be sure to check again before use.
(1)Confirmation of water feed
・Confirm that the feed water hose is firmly connected.
・Open the faucet.
・Confirm that the connection of feed water hose is free from water leakage.
(2)Confirmation of power supply
・Check if the power cord is connected to the appropriate socket outlet.
・Confirm that the power cord is inserted to the depth of main body power cord socket outlet.
Upon completion of preparation, start operation as follows.
Power application
Electric leakage breaker
Operation panel (initial display)
Operation panel (POWER key ON)
ON
l
り
OFF
り
4.Operation Method
Pre-start preparation and checks
①
Set the electric leakage breaker on the
right side of main body to "ON(|)."
●Initial display for 4 seconds
●Only the water quality unit lamp ON in 4
seconds
② Press the POWER key.
●The water quality is displayed in the Water
Quality Display.
21
Operation method