CONSTRUCTION
The tub surface is made of Lucite XL® Acrylic. The
substructure is a composite laminate constructed of fire
retardant fillers.
ELECTRICAL
Wired for 110 Volt 20 Amps with 3 outlets one for each
component (pump, blower, chromalight). Ground-Fault Circuit
Interrupter (GFCI) is required.
The unit must be connected only to a supply circuit that is
protected by a Ground-Fault Circut Interrupter (GFCI). Such
a GFCI should be provided by the installer and should be
tested on a routine basis.To test the GFCI push the test button.
The GFCI should interrupt power. Push the reset button. The
power should be restored. If the GFCI fails to operate in
this manner, there is a ground current flowing indicating the
possibility of an electrical shock.
ELECTRICAL ROUGH-IN
WARNING: When using electrical products basic precautions
should always be followed including the following: Rough-in
wiring to equipment on a Ground-Fault Circuit Interrupter
(GFCI). The GFCI circuit breaker must not supply any other
devices or circuits. An access panel must be installed to
permit pump service.
PROTECTION OF TUB
Use a section of the box, cut to size, and place in the bottom
of the tub. When possible, keep the box cover over the tub.
These steps will help protect the tub from abrasion or dam-
age during installation.
CLEAN PUMP SYSTEM
After tub is installed and ready to use, remove all construc-
tion debris and clean the pump and system.
SUGGESTION: During construction, we suggest that you
cover tub to avoid use as trash receptacle.

GENERAL NOTES

WARNING: Failure to follow instructions exposes users to
risk of electrical shock or fire.
PLUMBING ROUGH-IN
The bath waste pipe protrudes below the base approximately
one inch. Provide supply pipe, rough-in waste and vent per
local code.
BATH WASTE AND OVERFLOW
Read instructions enclosed with bath waste drain for proper
setting and fitting. Water tight installation of the drain is the
installer's responsibility.
1.
For Caulking, we recommend 100% sanitary silicone
rather than latex.
2. For quieter operation, you may choose to insulate the
surrounding.
INSTALLATION
TESTING
Connect trap to bath waste pipe. Temporarily connect garden
hose for water testing. Tub must be clean before filling. Seal
drain with plug and fill tub 2" above jet fittings. Run pump ap-
proximately 20 minutes. Check for leaks. Turn pump off and
let water sit in tub about 5 minutes. Check for leaks in return
pipe and fittings. Drain the tub and shut off circuit breaker.
NOTE: ALL TUBS ARE FACTORY TESTED FOR PROPER
WATERTIGHT OPERATION. However, the tub must be
filled with water to check for leaks that may have resulted
from handling, before finishing the tub installation. ACCESS
Tubs is not responsible for any defects that could have been
discovered, repaired or avoided by following this testing and
inspection procedure.
IT IS THE INSTALLERS RESPONSIBILITY TO
SUPPLY ACCESS TO PUMP AND EQUIPMENT.