  • Page 1 VERSION 1.0 MONTANA INSTALLATION MANUAL JUMP STRAIGHT TO OUR QUICK VIDEO GUIDE TO FITTING A POWERED WALK IN BATH:...
  • Page 2 MONTANA – POWERED SEAT WALK IN BATH KEY INFORMATION Maximum user weight: 26 stone / 165kg Water Capacity: 220ltr Approximate Bath weight (empty): 84kg Power Supply: Mains 230V to be supplied via 30mA RCD Operating Voltage: 24V Fuse Spur: 5 Amp IP65 rated Non-Switched Fused Spur...
  • Page 3: Table Of Contents

    CONTENTS PREPARATION OF SITE ��������������������������������������������������������������������������������������������������������������4 BATH FITTING ����������������������������������������������������������������������������������������������������������������������������������6 PLUMBING �������������������������������������������������������������������������������������������������������������������������������������������7 PANELS ���������������������������������������������������������������������������������������������������������������������������������������������������8 ELECTRICAL WORK �������������������������������������������������������������������������������������������������������������������10 BATTERY BACK UP ����������������������������������������������������������������������������������������������������������������������10 HANDSET FITTING ���������������������������������������������������������������������������������������������������������������������11 TESTING ����������������������������������������������������������������������������������������������������������������������������������������������12 CLEANING AND REPAIR ��������������������������������������������������������������������������������������������������������12 ADDITIONAL INFORMATION ��������������������������������������������������������������������������������������������13 M O N TA N A I N S TA L L AT I O N M A N U A L...
  • Page 4: Preparation Of Site

    PREPARATION OF SITE FIG. 1 This unit is heavy – minimum of two people are required to move it. Please ensure the bath is carried only by the frame or flange. Please read through carefully before commencing any work. 1 Carefully remove all packaging and inspect bath and panels thoroughly�...
  • Page 5 PREPARATION OF SITE FIG. 3 SOFT SEAT OPTION The material seat available on the bath provides a softer alternative to the solid option� The soft seat enables you to sit on the bottom of the bath maximising your bathing space and comfort� Fitting the soft seat is very similar to the standard solid seat�...
  • Page 6: Bath Fitting

    BATH FITTING 1 B efore the bath is in its final position identify the FIG. 4 best position for the taps, mark and drill the bath as needed. Install the waste and overflow to the bath. 2 Remove and dispose of the wooden Transport board/pallet transportation board/pallet but KEEP THE FOUR SLOTTED FOOT BRACKETS� See FIG. 4� Slotted foot bracket It is imperative the bath is correctly...
  • Page 7: Plumbing

    PLUMBING 6 E nsure the TMV is fitted in an accessible position suitable for easy maintenance and Ensure that the appropriate adjustment� Take a ‘Tee’ off the cold supply Water By-Laws are followed. before it goes into the thermostatic valve and run this to the cold tap� This allows the 1 The pipework should be fitted with isolators.
  • Page 8: Panels

    PANELS 1 The panels need to be held in place using FIG. 8 wall and floor battens, the configuration CORNER required depends on the installation of the Wall bath� See FIG. 8 for corner, alcove and straight wall examples� Batten sizes below: Wall battens approx. 50 x 50 x 400mm Seat Front panel battens approx.
  • Page 9 DO NOT silicone the panels into place. These may need to be removed for access in future. M O N TA N A I N S TA L L AT I O N M A N U A L...
  • Page 10: Electrical Work

    ELECTRICAL WORK The second spur is required to ensure the bath will continue to operate should there be a fault All electrical work must comply in the accessory fitted. current regulations and should only be carried out by a qualified electrician. HANDSET See info on PAGE 11� 1 The electrical supply should be fed via the mains through an RCD to 5 Amp IP65 rated EARTH BONDING...
  • Page 11: Handset Fitting

    HANDSET FITTING FITTING THE HANDSET PLUG FIG. 11 1 Firstly, locate the handset input port on the bath (FIG. 11)� The port is already drilled and fitted and can be located in the upper front panel or front shell rim near the seat� The handset plugs in here� 2 Now, taking care to ensure the slot on the plug matches up correctly with the plug port tab, gently push into place until properly seated...
  • Page 12: Testing

    TESTING CLEANING AND REPAIR Power up the bath and test the unit is functioning The installation is now complete� Ensure the bath by operating the ‘Seat up’ and ‘Seat down’ buttons is free from debris� Clean the door and seal with so that the seat moves ensuring the green power clean soapy water, removing any grit or build-up indicator light is visible on the control box�...
  • Page 13: Additional Information

    ADDITIONAL INFORMATION 2 Use a spirit level on all rims of the bath to verify ONLY follow the below changes if the NOTE the product is completely level� Ensure all bath door is leaking. feet are touching and secured to the ground� DOOR APERTURE ALIGNMENT 1 Level the bath from the highest elevation point 3 Using a straight edge or spirit level and with the...
  • Page 14 uidelines For service or sales queries please contact: Tel: 01527 400026 Email: info@accesswalkinbaths�co�uk www�accesswalkinbaths�co�uk...