3.Copy of the installation report and installation date.
4.Error message on eSolar Portal ( if available ) or any information which would
be helpful to determine the defect.
5.Detailed information about the entire system (battery, circuits, etc.).
1.4After receiving above information, SAJ will decide how to proceed the
service
•Repaired by SAJ factory, or SAJ authorized service center overhaul.
•Repaired on-site by SAJ Service Center.
•Offer a replacement device of equivalent value according to model.
In the case of an exchange, the remaining portion of the original warranty period
will be transferred to the replacement device. You will not receive a new certificate,
as your entitlement is documented at SAJ.
If the inverter needs to be replaced following assessment, SAJ will send a
replacement unit immediately. The defective inverter should be sent back to the
closest SAJ Service Center by packing in its original package if possible.
1.5Service after warranty expiration
If the inverters for maintenance are out of warranty, SAJ charges an on-site service
fee, parts, labor cost and logistic fee to end-user. Detailed standard refers to the
listed table.
Item
Without parts
replacement
With parts replacement
■ On-site attendance fee: Cost of travel and time for the technician in attending
on-site.
■ Parts: Cost of replacement parts (including any shipping/admin fee that may
apply).
Return Factury Maintenance
Labor + Logistic fee
(to & from SAJ)
Labor + Parts + logistic fee
(to & from SAJ)
- 52 -
R5
On-site Maintenance
Labor + On-site attendance
fee
Labor + On-site attendance
fee + Parts
Series
Need help?
Do you have a question about the R5-5K-T2 and is the answer not in the manual?
Questions and answers
Mijn zonnepanelen geven al 2 dagen niets. Ben gaan kijken en mijn omvormer is volledig uitgevallen. Geen enkele code te zien en ook geen enkel lampje dat brandt. Wat moet ik doen om te heropstarten?