Safety Advice Attention In some countries approval is needed to set up a marquee/tent larger than 75 m2. It is your responsibility to comply with local rules and regulations and to ensure that the marquee/tent is assembled correctly. In case of bad weather conditions, it is your responsibility to ensure the marquee/tent is safely secured and that the marquee/tent does not cause damage to others.
Congratulations on your purchase of our instant shelter. This unit is a combination of excellent manufacturing and design. It is comprised of a rigid frame and a durable cover. For easy assembly, we have marked all the parts with codes, with proper installation, use and maintenance, your unit will provide many years of good and suitable service.
Maintenance and care Annually or more often, the unit should be completely inspected internally and externally to make certain the unit remains properly installed and secured .Particular attention should be paid to: Hardware-check all carriage bolts and hardware connectors to be certain they are in place and tightened.
Page 5
5,5x15x4,1x5,3 part list Part code Description Curved roof tube Curved side roof tube in front and back panel l l a Sidewall Tube of front and back panel Sidewall Tube at right of front and back panel to connect the winch rail Horizontal wall and roof purlin Base flange in corner Base flange in corner...
Page 6
Lower door track for bottom rail Bottom rail for winch of mechanical door(beside the door) Cover Tensioning tube for roof cover 2sets Door dropping tube 12sets Door dropping tube at the bottom 2sets Cover tensioning tube of front and back cover Wind Brace Support The tube clip for wind brace support...
Page 7
Top cover above the door Door cover Single and Double Pulley 2sets Winch Rope for fastening the roof cover, the door cover and the front&back cover Stake peg Plastic cap of tensioning tube Turnbuckle and steel wire 8sets 26-09-2014-QJ...
Page 8
Figure 1 Sketch of Model 185017 Size: W5.5*L15*H5.3M...
Page 10
Step #1 --SECURING BASE FLANGES Sit the building boxes in the chosen location. Remove all the components from packaging to ensure all components are present by checking with the Part List. Figure 3 Position of Base Flanges Begin by determining exact location of the four (4) corners of the building. Mark front edge and side-to-side width of assembly on ground.
Page 11
Step #2 --ARCH ASSEMBLY Assemble each arch on ground. Each arches consist of: One curving roof tube (Part #1) Two roof curving tube (Part #2/2A) Two curving sidewall tube (Part # 3/3A/3B) Figure 4 the arch installation Connect the arches by Using the hexagon bolts with washers and nuts through predrilled holes in frame members.
Page 12
Check with the Part List and the Sketch Figure #1. Step #3 --ERECTING ARCHES Figure 6 Attaching Arches to Base Flanges Begin frame assembly by erecting Front Arch into Front Corner Base Flanges. Place left frame sidewall tubing into the upright tube socket into the Left Base Flange. Place Hexagonal Bolt through base flange socket and arch sidewall tube hole.
Page 13
Step #4 --POSITION ROOF COVER As figure 8 shows, when ready to install Roof Cover, unpack cover and lay parallel to building frame on one side. Cover must be pulled over top of frame assembly without being snagged or stressed on any frame members. Use multiple ropes over top of frame as shown in picture below.
Page 14
Step #5 --TENSION COVER ON FRAME FROM SIDE-TO-SIDE As Figure 9 shows, when Roof Cover is over top of Frame Assembly, insert Cover Tensioning Tubes into pockets along both sides of Roof Cover. Centre Roof Cover over Frame assembly both side to side and front to back. Align one side of Roof Cover evenly front to back.
Page 15
Figure 10 Fastening the two ends of the Roof Cover Figure 11 Fastening the two ends of the Roof Cover Figure 12 Open Door Cover...
Page 16
Installation of mechanical door The door dropping tube assembly (Seeing from inside) Figure 13 Installation of the Mechanical Door Step #9 --MECHANICAL DOOR INSTALLATION STEPS 1. Install Main Door Pulleys (left and right) over the Top of the Door on each side of the Door Beam (Part #9).