The three parts of the XLS-MSE3-ADPT are installed separately. The adapter plate is
installed first, followed by the inner door and then the outer door.
The XLS-MSE3-ADPT adapter plate has holes in it that fit over the studs in the MSE-3
backbox in only one way.
1.
Place the XLS-MSE3-ADPT over the studs in the backbox and secure it in
place with the hardware provided as shown in Figure 1.
XLS-MSE3(R)-ADPT
MSE-3
ADAPTER PLATE
BACKBOX
"C"
Figure 1
Installing the XLS-MSE3-ADPT Adapter Plate in the MSE-3 Backbox
2.
Install the required CC-5 system cardcage, PSC-12 power supply, and PTB
power termination board after careful consideration of NEC Article 760 for
separation of power limited and non-powered limited wiring. Refer to Figure
2. Use the hardware provided with those modules to mount them to the
adapter plate. Refer to the CC-5 Installation Instructions, P/N 315-033035,
and the PSC-12 Installation Instructions.
3.
One PTB can be mounted on the XLS-MSE3-ADPT on the bottom right of
the plate using the four studs provided. Refer to the PTB Installation
Instructions, P/N 315-034877 . The stud marked "D" in Figure 1 is a lug for
grounding the AC input. Remove the ground lug before mounting the PTB.
After installing the PTB, be sure to reinstall the ground lug.
4.
A battery set of up to 18 AH capacity can be placed in the bottom of the
enclosure.
5.
System cards can be installed in the CC-5 cardcage, as required.
"A" = 6-32 X
"A"
"B" =10-32 X 7/16 SCREWS (QTY. 2)
"C"
"C" = 6-32 HEX NUTS (QTY. 2)
"B"
"B"
"A"
"A"
GROUND LUG
(THIS LUG IS FOR GROUNDING
THE AC INPUT)
"D"
REMOVE GROUND LUG BEFORE
MOUNTING THE PTB.
AFTER INSTALLING THE PTB, BE SURE
TO REINSTALL THE GROUND LUG.
2
3/8 SCREWS (QTY. 5)
A6V10328636_en--_c

Advertisement

loading

This manual is also suitable for:

Xls-mse3r-adpt