III- ASSEMBLINGTHE BOILER
A. Placement of the cast iron block :
A stand should be constructed in compliance with the regulations and taking into account the dimensions and the weight of the boiler.
Position the cast iron block by taking into account the dimensions of the casing.
B. Hydraulic connection of the heating block to the installation :
- Connect the flow circuit and return to the 5/4" tappings.
- Connect the drain cock to the 1/2" tapping on the lower part of the front element of furnace.
Back sup-
port of
casing (1)
For optimal insulation do not overtighten.
E. Coupling of the furnace to the flue :
- Provide a 150 or 130/125 mm smoke pipe
- Height from socket to axis of smoke pipe : 558 mm
- Place the flue collar
- Ensure the air tightness of the coupling
Important :
Before installing the boiler, foresee enough space behind
it to enable the placing of the rear panels.
Grommet
Important : take into account the total
space of the casing by making the
hydraulic connection of the boiler to the
heating circuit.
C. Fixing the back support of the casing (1):
For this, place the back support of the casing
on the upper braces using the two M12
DIN 934 screws supplied with the screw-kit.
Fix the two grommets on to the back support
D. Fixing the insulation:
1. Place the insulation around the heating
body, joining the insulation mat below the heating body.
2. Bind it with the tapes but do not tighten to
much (to obtain optimal insulation).
3. Place the pre-cut insulation on the back side (hydraulic
connection and connection with the chimney)
4. Hold in place with the tapes.
Adapt smoke pipe length according to
boiler dimension.
250
min.
Pipe
500
250
max.
min.
Boiler
Burner
5