The wall fixation is always mounted on the top row.
Depending on the actual system configuration, the rear wall fixation employs 2 or more aluminum telescope
bars and a diagonal arrangement of slack steel cables, respectively
The max. distance between two telescope bars is 3 modules. Between the telescope bars (2n) and (2n+1), the
diagonal arrangement of steel cables is fixed (n = 1, 2, 3...).
The fix plate to the structure is mounted by means of 2 self tapping screws M6x29 using the holes for the curved
connection kits.
The telescope bar is slid into the cylinder and fixed with two screws M6x50.
The fix plate to the wall is mounted to the wall by means of
2 x ZYKON – anchor FZA 18x80 – M 12/25 (zinc-plated steel)
Barco - OV-708/OV-713/OV-715– R59770137 – installation manual – revision 01– September 2007 ________________________________
Example:
A display wall which is 4 modules in width is
fixed to the wall by 3 telescope bars.
The diagonal arrangement of slack steel cables
is between the second and the third telescope
bar.
_______________________________________________
________________________________
________________________________
Wall attachment
_______________ 71
_______________
_______________

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ov-713Ov-715

Table of Contents