Download Print this page

GasTech BAYKAN Series User Manual page 18

Wall-hung 24-30-35 kw mono-thermic type-c

Advertisement

Furthermore the said operations must be performed in conformity with regulations and norms in
effect.

At the end of each and every heating period, have your device checked by qualified technicians
hence you will own a device operating and performing very well.
BEFORE THE MAINTENANCE STAGE, YOU MUST
 Check the declaration of conformity.
 Check the installation records.
 CHECK THE MANUAL-INSTRUCTIONS BOOK
 Check the installation location of wall hung boiler visually.(the location must conform the
recommended norms).
 Visual inspection of flue channels and chambers.
 Inspection of discharging of particles and substances that form due to burning. 

MAINTENANCE WORKS
 Cleaning the growing coverings that may form on exchangers and electrodes
 Getting rid of the oxidation that may form on boiler;
 Opening the device, turning it off and checking its operation efficiency;
 Checking for the leaks from sleeves, pipes and gas and water connections;
 Checking the operation and performance of safety components;
 Checking the proper operation and efficient running of the set up and control elements
of the device;
 Checking the solidity of the apparatus and/or pipes through which the waste gases are 

evacuated and their efficiency;
 Visual check of any obstruction at the entry of safety valve;
 Checking the static pressure of the installation;
 Checking the intactness of safety components and/or the presence of any short circuits; 

! 18

Hide quick links:

Advertisement

loading