Download Print this page

GasTech BAYKAN Series User Manual page 11

Wall-hung 24-30-35 kw mono-thermic type-c

Advertisement

Caution : The installing area and waste gas discharge area must conform the directives of Gas
Distribution Company, TSI and international regulations.
2. PLACEMENT OF THE WALL HUNG BOILER
2.1 MOUNTING THE WALL HUNG BOILER TO THE WALL
! Considering the dimensions of your device and by using the installing and mounting diagram on the
packages, determine the positions of wall screws and sign them.
NOTE: You should leave a space of at least 40 cm. under the device while mounting your boiler to the
wall.
!  Determine the positions of connecting parts by using the assembly figure.. Fig.6
!  Place the hanging screws in their positions according to the measurements given in the figure.
!  Hang your wall hung boiler to hanging screws. 

2.2 WATER AND GAS CONNECTIONS 

Before starting the procedures related with water connections, we recommend you to wash the
installation in order to get rid of the particles that may be present in pipes and radiators. 

! Connect the water and gas according to the positions shown in the figure. 

! Connect the outlet of safety valve to the waste water line by means of a hose. 

(Otherwise, the manufacturer of the wall hung boiler shall not be liable for the cases that arise due to
the intermeddling of the safety valve. ) 

!  Place a valve to the inlet of each of water and gas pipe lines. 

!  Ensure that the pressure of domestic water is 1-6 bars. If the water pressure is higher than 6 bars, use
pressure set up valve. 

!  A dirt collector must be connected to the water entries. 

Figure 6.
! 11

Hide quick links:

Advertisement

loading