GasTech BAYKAN Series User Manual page 17

Wall-hung 24-30-35 kw mono-thermic type-c

Advertisement

 In order to record this data, wait until you go back to the main menu. 

For Baykan eko star-moon version
By rotating unto the # (snowberry) symbol symbolized with "A", turn the boiler on. Turn the boiler
on and check the gas pressure by means of a monometer.

Adjust the pressure by means of the P2 trimmer seen in the diagram in Figure 5 which is
covered by a lid placed behind the display screen.
3. REPLACING THE SUPPLY GAS
CONVERSION FROM NATURAL GAS TO LPG
 Lift the front face and dismantle the lid of the closed chamber.
 Loosen the four screws which fix the (A) burner to the platform, dismantle the burner (B) 

and change (C) nozzles with those that allow LPG, do not forget to fasten the (D) 

washers with the help of a 7 mm. key.
 Install the boiler again.
 Place Mobile JP 1 connection on the process card between 1-2 (LPG) circuits. (see 

figure nr. 5).
 Ensure that the pressure on the boiler is min. 25 and max. 35 bars for butane gas and 

min. 25 to- max 37 mbar for Propane furthermore you should also be aware of and 

check gas leakages.
 Readjust the heating capacity set up by means of the tap water maximum and minimum 

capacity set up and ? do not forget that the maximum pressure value shall be maintained
by tightening up the nut "A" (figure nr. 18 ). Certainly, always ensure that the pressure of the
wall hung boiler is equal to or less than the pressure specified above.
CONVERSION FROM LPG TO NATURAL GAS
 Lift the front face and dismantle the lid of the closed chamber.
 Loosen four screws which fix the boiler (A) to the platform, dismantle burner (B) and
replace (C) nozzles with the ones which conform with natural gas., do not forget to attach
the washers (D) by using a 7 mm. spanner. 

MAINTENANCE
All maintenance Works must be performed by,

AUTHORIZED PERSONNEL .

! 17