Final Setup; Level The Dryer - GE GFD14 Owner's Manual & Installation Instructions

Table of Contents

Advertisement

FINAL SETUP

LEVEL THE DRYER

1
Stand the dryer upright near the final location and
adjust the four leveling legs at the corners to ensure
that the dryer is level from side to side and front to
rear.
Lower
Raise
PLUG DRYER IN
2
NOTE: Stacking installations may require a power
cord up to 6 feet in length.
49-3000087 Rev 1
Installation Instructions
Ensure proper
ground exists
before use.
DRYER START-UP
3
Press the Power button.
Power
NOTE: If the dryer has been exposed to temperatures
below freezing for an extended period of time, allow it to
warm up before pressing Power. Otherwise, the display
will not come on.
The dryer is now ready for use.
WARNING
- Electrical Shock Hazard
Disconnect power supply before servicing.
Replace all parts and panels before operating.
Failure to do so can result in death or electrical
shock.
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents