Final Setup; Level The Dryer; Dryer Start-Up - GE GTD45GASJWS Installation Instructions Manual

Hide thumbs Also See for GTD45GASJWS:
Table of Contents

Advertisement

EXHAUSTING THE DRYER (cont.)
SIDE OR BOTTOM VENTING (cont.)
ADDING ELBOW AND DUCT FOR EXHAUST TO
LEFT OR RIGHT SIDE OF CABINET (cont.)
• Apply duct tape as
shown on the joint
between the dryer
internal duct and the
elbow, and also the joint
between the elbow and
the side duct.
Use 4" rigid metal ducting only inside the dryer.
Internal duct joints must be secured with tape,
otherwise they may separate and cause a safety
hazard.
ADDING ELBOW FOR EXHAUST THROUGH
BOTTOM OF CABINET
• Insert the elbow through the rear opening and
connect it to the dryer internal duct.
• Apply duct tape as
shown on the joint
between the dryer
internal duct and the
elbow, and also the
joint between the
elbow and the bottom
duct.
Internal duct joints must be secured with tape;
otherwise, they may separate and cause a safety
hazard.
ADDING COVER PLATE TO REAR OF CABINET
Plate
(Kit WE1M454)
Connect standard metal elbows and ducts to
complete the exhaust system. Cover back opening
with a plate (Kit WE1M454) available from your
local service provider. Place dryer in final location.
NEVER LEAVE THE BACK OPENING WITHOUT THE
PLATE.
(Kit WE1M454.)
Installation Instructions
DUCT
TAPE
Duct tape

FINAL SETUP

1

LEVEL THE DRYER

Stand the dryer upright near the final location and
adjust the four leveling legs at the corners to ensure
that the dryer is level from side to side and front to
rear.
Raise
Lower
2
PLUG DRYER IN
Ensure proper
ground exists
before use.
3

DRYER START-UP

Press the Power button.
NOTE: If the dryer has been exposed to
temperatures below freezing for an extended
period of time, allow it to warm up before pressing
Power. Otherwise, the display will not come on.
The dryer is now ready for use.
13
Power

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gtd65gbpldgGtd65ebpldgGtd65gbsjwsGtd45easjws

Table of Contents