3 INSTALLATION OF THE ELECTRICAL GENERATOR
3.1
UNLOADING AND TRANSPORT
The unloading and transport of the unit should only be done by qualified personnel,
observing certain minimum safety conditions.
•
The ground must be capable of supporting the full weight of the Generator and
the forklift.
•
Make sure that the battery is disconnected.
•
Make sure that the fuel tank is empty.
•
Place the open arms of the forklift below the chassis at an equal distance with
respect to the lifting frame.
•
With a hoist, raise the unit using the lifting frame eyebolt.
The image below shows a generator unit that which includes a frame with a single
lifting point.
If your unit includes a trailer, one of the following may apply:
•
Trailer 1 - Site trailer: Connected with a DIN hitch ring and safety chains to the
rear of the towing vehicle. Use of this Trailer is not authorized on public roads.
Use the safety brake whenever necessary.
•
Trailer 2 - Road trailer: Keep in mind the legal considerations detailed in point
3.3.
USERS MANUAL
RENTAL SERIES ELECTRICAL GENERATOR
Image 9 - LIFTING FRAME
Page 13 of 62