Electric Connections - RIB Jolly big one Installation Manual

Hide thumbs Also See for Jolly big one:
Table of Contents

Advertisement

Available languages

Available languages

G
B

ELECTRIC CONNECTIONS

These instructions are only valid if the operator is located on the support
of the shutter with the motor facing to the right (as seen from the inside
of the building).
CAUTION: If the operator is assembled with the motor facing to the left
(as seen from the inside of the building), the movements of the operator
and therefore of the run stops are reversed.
Practically C1 becomes the opening run stop and C2 becomes the closing
run stop - OPEN closes and CLOSE opens.
Initial state - as supplied by the factory
C1 = Closing run stop
C2 = Opening run stop
C1 and C2 must both rest against Seger rings S1 and S2 assembled on
the screw of the run stop.
The switch must be in the INS position.
Unscrew the run-stop cover using a small Philips screwdriver.
Strip the cable for 27 cm and shorten the 3 power supply wires to 4 cm.
Connect the yellow/green earth wire to the fixed terminal provided on the
motor.
Pass the earth wire of the motor power supply cable through the 1st free
hole in the run stop container.
Connect the earth wire to the aluminium support.
24
24
24
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jolly big two

Table of Contents