Laars FTCF140 Installation And Operation Instructions Manual page 32

Floor-standing, modulating gas, condensing, combination boiler
Table of Contents

Advertisement

Page 32
The gas connection fitting on the unit is
1/2"(FTCF140) or 3/4"(FTCF199) male NPT.
The supply line must be sized for the maximum
output of the combination boiler model being
installed. If there are additional gas appliances
from the main supply line, you must measure
sizes of the supply line according to the
COMBINED total maximum BTUH draw for the
appliances as if they were all operating at the
same time.
Measure the length of the gas supply line from
the gas meter to the Combination boiler.
Use the tables in this manual or refer to the gas
line manufacturers sizing information to determine
the correct supply pipe size.
The gas shut-off valve in the gas supply line
should be installed close to the unit.
FTCF140
FTCF199
To facilitate any future maintenance, it is also
recommended that an approved gas union fitting
be installed in the supply line between the shut-off
valve and the 3/4" male NPT connection on the
Combination boiler.
1)
2)
3)
Do not operate the combination boiler until all
connections have been completed and the heat
exchanger is filled with water.
Manual Shut-Off Valve
Manual Shut-Off Valve
Install an approved gas line pipe to gas line
connection to the combination boiler.
Include manual shut off valve and gas union
connection, as shown.
Test gas pressure to make sure it meets the
minimum standards and does not exceed .the
maximum standards for the combination boiler.
Leak test the gas line pipe before placing the
unit in operation. Use approved leak detector
liquid solutions only to check for leaks.
Closed Position
1/2" Minimum
Gas Pipe
Closed Position
3/4" Minimum
Gas Pipe

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ftcf199Ft series

Table of Contents