Installation manual Bondtech Wanhao D9 Upgrade Kit V1.0
• Carefully tighten the three M3
screws.
• Slide the extruder onto the
bottom plate guiding the recess
for the heat break so it fits over
the heat break, align the two M3
bottom holes with the screws
removed earlier and tighten them
using a 2,5mm hex wrench.
• Mount the new breakout board in
place by using the two
protrusions and snap-fits on the
extruder body.
Start by aligning the right side of
the breakout board into the slot
on the extruder body.
8