Table of Contents

Advertisement

1. From the rear of the rack, insert the I/O
subsystem into the position from which it
was removed. The end of the I/O
subsystem that has the power supplies
goes toward the front of the rack.
2. Support the I/O subsystem as you push it
toward the front of the rack.
3. Install the retaining screws (A) in the rear
of the I/O subsystem unit.
4. Reconnect the cables to the rear of the I/O
subsystem.
18. Configuring I/O enclosures
View and change various I/O enclosure attributes. After the server firmware has reached the
standby state, you can configure I/O enclosure attributes as follows:
v List the status, location code, rack address, unit address, power control network identifier, and the
machine type and model of each enclosure in the system.
v Change the identification indicator state on each enclosure to identify or off.
v Update the power control network identifier, enclosure serial number, and the machine type and
model of each enclosure.
v Change the identification indicator state of the SPCN firmware in a enclosure to Enable or Disable.
Remove rack and unit addresses for all inactive enclosures in the system.
v
To perform this operation, your authority level must be one of the following:
v Administrator
v Authorized service provider
To configure I/O enclosures, do the following:
a. On the ASMI Welcome pane, specify your user ID and password, and click Log In.
b. In the navigation area, expand System Configuration and select Configure I/O Enclosures.
c. Select the enclosure and the desired operation. If you select Change settings, click Save setting to
complete the operation.
19.
Go to Verification Procedures.

Fan

Use this procedure to service the fan.
1.
The component will be serviced concurrently. Power should not be removed from the unit.
10
Power Systems: 5790 and 7311 model D11 removal and replacement procedures

Advertisement

Table of Contents
loading

This manual is also suitable for:

5790

Table of Contents